The order a bathroom goes back together
Six lines on the slip, written in the order the work happens. No line gets skipped and none gets signed off early.
01Demo
Old tile and tub surround come out; framing and subfloor get a look, and soft wood is replaced.
02Rough-in
Drain and supply positions are set to the new fixtures while the wall is open.
03Waterproof
Backer board or membrane goes on before tile, seams sealed, corners and niche treated.
04Tile
Laid out from the centre line, floor flattened first, grout and caulk in the right joints.
05Fixtures
Vanity, faucet, toilet and shower trim set, then every line run and checked for drips.
06Punch list
Caulk lines, doors, hardware and touch-ups walked through and ticked off.